![]() ![]() Roger said that a plumber came out on March 23, 2022, and that is the last time anyone worked on her project. 25, 2022, a plumber was onsite to move a shower and drain. 23, 2021, Rogers said demo work began in a bathroom. 30, 2021, when an electrician arrived to do work, which Rogers said was never permitted. After many delays, Rogers said work finally began on Sept. The total cost of the project was $36,200, and Rogers paid a 50 percent deposit of $18,100. Lisa Rogers contracted banks on March 17, 2021, for a kitchen and bathroom remodel. Milton man arrested, deputies find 100 files of child pornography: SRCSO reports She said Banks told her that he was regrouping his company and team and would let her know by June 13, 2022, when her project would resume. On May 15, 2022, Harriman said Banks installed temporary walls in the sunroom, but never completed any other work. No additional work was done until May 9, 2022, when Harriman said Banks came and demolished the sunroom walls. Harriman said Banks did not start work until April 20, 2022, when Banks demolished the front porch. The total work of the project was $36,940, and she paid a 50 percent deposit of $18,470. 1, 2021, for a replacement porch and renovated sunroom. On June 1, 2022, Banks began the patio work, but after the media started reporting on the contractor, Perry said he never performed any additional work.īette Harriman contracted Banks on Dec. Perry said Banks began the installation of the pocket door in Dec. She said she paid Banks a deposit of $39,800. The total cost of the project was $79,600. 12, 2021, Colette Perry contracted Banks for a covered porch, office addition, laundry room conversion and built-in cabinetry. ![]() Cadden said work finally began on April 25, 2022, to begin breaking up the 400-square-foot concrete patio slab, but after the slab was removed, Banks never returned. He said he paid a 50 percent deposit of $27,250. 21, 2021, for a second-story deck and pergola. 6, 2021, Riggs said she paid an additional $1,250 for the flooring project.Ĭharles Cadden contracted Banks on Oct. Riggs said that Banks did tear out the flooring, but it quickly came to a halt when Banks’ installer encountered a problem. She said she paid a 50 percent deposit of $22,820. 22, 2021, Kerri Riggs contracted Banks for an alteration on her home. Eglin Air Force Base helps evacuate aircraft to Louisiana ahead of Hurricane Ian ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |